A specification that starts from a catalogue number solves the wrong problem. Every Krumm Tec system starts from the part, the soil and the site it has to live in.
The sequence
Six stages from part to plant
Open a stage to see what happens in it.
Material, geometry, surface sensitivity, the contamination itself, the cleanliness target, throughput and the site constraints, all established before any equipment is proposed.

Tests run in the Krumm Tec laboratory on your actual parts. The result is documented: method, medium, temperature, cycle time and the cleanliness achieved.

Medium, energy input and sequence chosen together: aqueous or solvent, pressure or ultrasound, oscillation, temperature, handling. Most requirements are met by combining processes rather than picking one.

The enclosure is built around that process: manual, semi-automated or fully automated, from a bench cabin to an integrated line. Powder-coated steel or stainless throughout.

PLC control with programmable cycles, temperature and time control, stored programmes recalled from a panel. Where the process is ATEX-relevant, the explosion-protection documentation is produced alongside.

Installation, operator training, annual inspection, spare parts and later optimisation as new parts and contaminants enter the process. In the UAE this is handled in-country.

Custom systems
When the standard range does not fit
Numerous customers find nothing in the standard programme that fits. The process is too special, the machine has to integrate into an existing line, or the part is simply the wrong shape for a catalogue chamber.
- Chamber sized to the part, not the catalogue
- Integration into an existing production line
- Combined methods in one enclosure
- ATEX-protected variants of most systems
- Interfaces for data readout and archiving



Engineering solutions for operational readiness
Discuss your requirement with our engineering team.
Tell us about the part, the contamination and the operating environment. We will come back with a process concept, not a catalogue number.